Works to the western side of the site are progressing well, with the roof coverings and finishes almost complete. Plots are now being plastered and prepared for decoration. Once the brickwork is completed on the west blocks, scaffold will be removed.

We have completed the piling to the Gatehouse of Grand Avenue and we are now excavating and forming the basement floor slab and walls. Due to the restricted space within this part of the site, the construction of this unit will be slower than on other parts of the site, but should be completed by Spring 2017.

Window installation to the east blocks has already started and is due to be completed by the end of the month. Brickwork will then commence to allow the roofs to be installed which will enable us to make the buildings watertight and the internal fit out can commence.

The ground floor slabs to the houses are being constructed, which will allow for the construction of the block work wall to upper levels.

The basement car park is gradually being opened up for use for staff and contractor parking.

Our sales and marketing suite is open, if you’d like to visit please contact the sales team on 0208 501 8777 or enquiries@woodsidesquare.co.uk.